----- Wednesday, August 17, 2005 -----
Cypress Sea Experimentation Set-up
 All Day (Monterey/NPS Area)
----- Thursday, August 18, 2005 -----
Above & Below Water SA for Combat Diver
All Day (Cypress Sea - Monterey/NPS Area)
 -Modified NAVBOARD
-ARIES AUV
-Cypress Sea Boat
-Pelican Surrogate UAV
-802.11, 802.16 Comms
----- Monday, August 22, 2005 -----
VPN Checkout w/BFC & LLNL
 All Day (Monterey/NPS Area)
----- Tuesday, August 23, 2005 -----
Shipboard Technology w/LLNL & BFC
8:00 AM-12:00 PM (Monterey/NPS Area)
 -Radiation Detection
-Biometrics
-UWB
-Ship-to-Ship Comms
-Ship-to-Shor Comms
-SA/Groove
LLNL GM-5 Radiation Detection Sensor Demo
 1:30 PM-2:00 PM (NPS - GIGA Lab)
ONR Collaborative Technology Meeting
2:00 PM-4:00 PM (NPS)
 -Ewall, etc.
----- Wednesday, August 24, 2005 -----
RFID w/LLNL
8:00 AM-12:00 PM (NPS)
 -Passive and Active
-Logistics into Network
-RFID into Tactical Mesh SA
----- Thursday, August 25, 2005 -----
802.16 Encryption
8:00 AM-11:00 AM (NPS)
 -Secure LAN over Routers
Network Defense
11:00 AM-12:00 PM (NPS)
 -Honeypots
MAUV Flight Demo w/Camera
1:00 PM-3:00 PM (NPS)
 -In Building ???
----- Saturday, August 27, 2005 -----
TNT 05-4 Advance Party
8:00 AM-12:00 PM (Camp Roberts)
 Advance Party to Camp Roberts for TNT 05-4 Set-up
TNT 05-4 Advance Party Set-Up
12:00 PM-6:00 PM (Camp Roberts)
 Advance Party begins set-up for TNT 05-4 at McMillan Airfield, Camp Roberts
-Tethered Balloons
-Network Connectivity Checks
-Backup Servers Installed and Operating
-TOC/DNOC Workspaces Assigned
----- Sunday, August 28, 2005 -----
TNT 05-4 Preparation
All Day (Camp Roberts)
 -Travel Day for SOCCOM
-Check Operation of ITT Mesh Network
-LRV travels to Camp Roberts and conducts op check w/802.16, ITT Mesh & Iridium
-Tethered Balloon connectivity w/LRV & TOC
-Verify VPN Iridium Comms in LRV transit from TOC to Parade Field (C.R. Mainside)
-Test Flight of NPS SUAV w/PVNT for prescison target location
-TERN UAV payload test flight within balloon mesh and find limits of TOC to TERN via ITT omni
----- Monday, August 29, 2005 -----
Pick-Up HMMWVs
8:00 AM-9:30 AM (Camp Roberts - East Garrison )
 -5 Drivers
TNT 05-4 In-Brief
9:30 AM-10:15 AM (TOC)
 -Experiement Facilitator and Coordinator
-Safety Issues
-Environmental Concerns
-Air Space Deconfliction & Control Plan
-Frequency Deconfliction & Control Plan
VPN Checkout w/BFC
 10:15 AM-10:45 AM (TOC)
Deploy ExScal Sensors & Stargates
 10:30 AM-11:30 AM (McMillan Airfield )
Deploy AD/RA Sensors
 10:30 AM-11:30 AM (McMillain Airfield)
Deploy RFID Tags on Truck
 10:30 AM-11:30 AM (TOC)
MMALV Operational Test
11:00 AM-12:00 PM (McMillan Airfield)
 -Fly, Land, Crawl w/Look-up Video
AFRL ExScal Operational Test
12:00 PM-1:00 PM (TOC)
 -Verify operation and integration into network SA
AD/RA Operational Test
1:00 PM-2:00 PM (TOC)
 -Verify operationa nd integration with network SA
RFID Operational Test
2:00 PM-3:00 PM (TOC)
 -Verify operation and integration with network SA
IED Smart Jammer Operational Test
3:00 PM-4:00 PM (TOC)
 -Verify operation
TNT 05-4 Pre-Execution Brief
4:00 PM-5:00 PM (TOC)
 -Overview of Scenarios (SOFTools)
-Watchstander, Experimenters and Support Personnel Duties and Responsibilities
-Review Data Collection Plan
-Review remaining TNT 05-4 Schedule
-Review "Quick Look" documentation requirements
----- Tuesday, August 30, 2005 -----
TNT 05-4 OpNet Modeling
 August 30-August 31 (Camp Roberts/NPS)
TNT 05-4 Experimentation
7:30 AM-8:30 AM (TOC Camp Roberts)
 -All personnel on-deck, watchstanders in position
-Set-up, equipment checkout, airspace & freq deconfliction
-Raise Balloons, verify network connectivity (802.16, ITT Mesh)
TNT 5-4 Scenario 1 - SOF HVT Search & Convoy IED Threat
8:30 AM-11:15 AM (Camp Roberts)
 -VPN Iridium Comms
-SOF w/Inter-4 ITT Mesh TactiComps
-LRV, HMMWVs
-BFT
-RFID
-HIS Observations

TNT 05-4 Scenario 1 - Hotwash
11:15 AM-12:00 PM (TOC)
 -All Scenario 1 participants
-Review data collected
-Determine "Quick Look" documentation
-ID scenario 2-4 adjustments
Lunch
 12:00 PM-1:00 PM (TOC)
TNT 05-4 Scenario 2
1:00 PM-5:00 PM (TOC)
 -Scenario 1+
-Biometris PC linked to BFC
-TERN UAV video of IED
-Return route: NPS SUAV + PVNT & MMALV for precision location and image of IED
-HSI observations
TNT 05-4 Scenario 2 - Hotwash
5:00 PM-6:00 PM (TOC Camp Roberts)
 -All Scenario 2 participants
-Review data collected
-Determine "Quick Look" documentation
-ID scenario 3-4 adjustments
----- Wednesday, August 31, 2005 -----
TNT 05-4 Experimentation
7:00 AM-8:00 AM (TOC Camp Roberts)
 -All personnel on-deck, watchstanders in position
-Set-up, equipment checkout, airspace & freq deconfliction
-Raise Balloons, verify network connectivity (802.16, ITT Mesh)
TNT 05-4 Scenario 3
8:00 AM-12:00 PM (TOC Camp Roberts)
 -Scenario 2 +
-Iridium replaced w/ITT Mesh
-AFRL ExScal and AD/RA sensors
-HSI Observations
-IED Smart Jammer used from HMMWV
TNT 05-4 Scenario 3 - Hotwash
12:00 PM-1:00 PM (TOC Camp Roberts)
 -All Scenario 3 participants
-Review data collected
-Determine "Quick Look" documentation
-ID scenario 4 adjustments
Lunch
 1:00 PM-2:00 PM (Camp Roberts)
TNT 05-4 Scenario 4
2:00 PM-5:00 PM (TOC Camp Roberts)
 -Scenario 3+
-ITT Mesh replaces w/airborne 802.16 comms
-DRT locates IED trigger person
-HSI Observations
TNT 05-4 Scenario 4 - Hotwash
5:00 PM-6:00 PM (TOC Camp Roberts)
 -All Scenario 4 participants
-Review data collected
-Determine "Quick Look" documentation
-ID make-up/follow-up experiments for Thursday 1 Sep 05